
|
HIDALGO IRRIGATION DISTRICT - SAN JUAN, TX
PIPE REPAIR PROJECT - COMPLETED JAN 27, 2000 NO LEAKS! Project supervised by Cheryl Andrews of Otto Dukes Supply - 361.883.0921 |
||||||||||||
| ||||||||||||
| Excavated pipe showing previous patch and leaking crack. | ||||||||||||
| Saw 1/8" cut in the center of the joint approximately 1" ~ 1.5" deep. | ||||||||||||
| Insert Adeka Ultra Seal 8mm string. Adeka Ultra Seal P-201 was applied between the overlap and at several places before inserting the string. | ||||||||||||
| Complete by applying hydraulic cement. | ||||||||||||